EN / ES Free Estimate
⚡ New Construction · Sarasota, FL
New Construction Electrical

New Home Electrical Built to Last

From rough-in to final inspection, we handle every phase of new construction electrical — on schedule, to code, and without the headaches that slow down a build.

FL Master Electrician ES12001543 · Licensed & Insured · 29 Years Experience
3Build Phases
200A+Panel Sizing
PermitAlways Included
29 YrsExperience
Licensed Master Electrician
Permit Pulled & Inspected
Same-Day Estimates
Navy Veteran Owned
Nextdoor Neighborhood Fave

Three Phases, One Electrician

New construction electrical happens in phases timed around the rest of the build. Getting that timing right — and showing up for each phase without being chased — is what makes an electrician a GC's go-to sub.

  • Rough-in: after framing, before insulation — wire runs, boxes, and service entrance
  • Rough-in inspection: we coordinate and are on-site for the inspector
  • Trim-out: after drywall and paint — devices, fixtures, panel covers, and final connections
  • Final inspection: we schedule it and handle any corrections on the spot

We work directly with your GC on scheduling — no chasing, no excuses. If we say we'll be there Tuesday for rough-in, we're there Tuesday.

What We Size and Plan

Before the first nail goes in, we review the plans and calculate the electrical load — total square footage, HVAC system, appliances, lighting design, and anything else the homeowner is planning (EV charger, pool, generator). Getting the panel size right at the start avoids expensive changes later.

  • Load calculation based on actual plans, not estimates
  • Panel placement and service entrance coordination with the builder
  • EV charger conduit rough-in during framing (the best time to do it)
  • Generator transfer switch pre-wire if planned
  • Outdoor outlet and lighting circuit layout
  • Low-voltage prep (data, media, security) if needed
  • ADU electrical on the same property — subpanel, feeder, full wiring (see our ADU page)

Homeowners can request us directly. If you're building a new home and your GC uses a different electrician, you can ask for JEEC Electric by name. We'll work directly with your GC — it's your home, and you should have confidence in every trade on the job.

What We Install in a New Build

Service & Panel

Service entrance, meter base, and main panel installation — sized correctly for the home's load from day one. We coordinate the utility connection and schedule the inspection so the panel is energized on time.

Rough-In Wiring

Every circuit in the home — lighting, outlets, appliances, HVAC, exterior — gets run during rough-in. We place boxes, label every circuit, and have it inspector-ready before drywall is scheduled.

Trim-Out & Final

After drywall and paint, we install all devices, switches, fixtures, and covers. Panel is labeled, circuits are tested, and we coordinate the final inspection. The home isn't done until it passes.

New Construction Electrical FAQs

When does the electrician come in during new construction?
There are three main phases: rough-in (after framing, before insulation and drywall), rough-in inspection (before drywall is closed up), and trim-out (after drywall, paint, and cabinets). We coordinate with your GC or project manager to hit each phase on schedule.
What is included in a rough-in?
Rough-in is everything inside the walls — running wire from the panel to each outlet, switch, fixture, and appliance location. It also includes installing boxes at each location. This is the phase that gets inspected before drywall goes up.
How is the panel size determined for a new home?
We calculate the total electrical load based on your home's square footage, HVAC system, appliances, lighting, and any planned additions like an EV charger or pool. Most new homes today are built with 200-amp service. Homes with higher loads may need 400 amps or a subpanel.
Do you work directly with homeowners on new construction, or only through GCs?
Both. Most new construction comes through a GC who brings us in as the electrical sub. But we've also worked with homeowners who are acting as their own GC or who want to hire their trades directly. Either way, we show up, do the work, and coordinate the inspection.
Can you install EV charger wiring during new construction?
Yes — and this is the best time to do it. Running conduit and wire for a future EV charger during rough-in costs a fraction of what it costs to retrofit later. We can rough in the circuit and install the outlet or charger at trim-out, or leave it capped for a future install.

Building a New Home in Sarasota?

Free estimate. We work with GCs and homeowners directly. Serving Sarasota, Manatee, and surrounding counties.

Get Free Estimate ☎ (941) 387-4652
Proud Member Of 2026 Sarasota Chamber Member — U.S. Chamber of Commerce Accredited Suncoast Builders Association member Florida Home Builders Association (FHBA) member National Association of Home Builders (NAHB) member
Call Now — (941) 387-4652